| |
In order to make sure your roofing job will run smoothly, we have
put together a list of things that you can do to help us achieve
this.
• Delivery of the shingles will take place 1 day before your
start date.
• Please have all vehicles out of the driveway on both sides
of the house.
• If possible, please have a space clear in the street in
front of your house.
• Please be sure to have grass cut as short as possible so
that we are able to run our wheel magnet to pick up nails.
• Cover all valuables in attic and in garage.
• If we are doing the garage roof, please have all vehicles
out of garage.
• Please make sure there are no animals in the yard.
• Please make sure the outside electricity is turned on.
• If you do not have outside electricity: Please run an extension
cord outside, but please make sure it is not plugged in the same
circuit as your refrigerator or freezer in case of a circuit interruption.
• Make sure your air condition unit is turned off so that
we can cover it to protect it from damage.
Please remember there will be higher noise levels and a lot of activity
around your home while we are there working on your home improvement.
We do ask that in order to insure your families safety, please keep
everyone away from the vicinity of the work being done on your home.
We greatly appreciate your cooperation.
|